Bread with increased arabinoxylo-oligosaccharide content

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9480262
APP PUB NO 20100040736A1
SERIAL NO

12522148

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for increasing in a baked product, after baking, the level of water-soluble arabinoxylan with an average degree of polymerization ranging from 5 to 50, comprising preparing a dough for a baked product with flour having a total arabinoxylan content of at least 2.0%, and adding to the dough an enzyme preparation comprising at least one thermophilic endoxylanase in an amount at least two-fold higher than the amount conferring 90% of the maximal bread volume increase obtained by addition of such enzyme preparation to the recipe of the baked product. Using this method, baked products can be obtained that have a level of arabinoxylan of at least 1.7% The present invention further relates to baked products obtainable by this method, and to an improver and a dough which may be used for the preparation of such products.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PURATOS N V1702 GROOT-BIJGAARDEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arnaut, Filip Roosdaal, BE 15 17
Broekaert, Willem Dilbeek, BE 38 193
Courtin, Christophe Wilsele, BE 9 81
Delcour, Jan Heverlee, BE 19 112
Georis, Jacques Liege, BE 11 9
Van, Haesendonck Ingrid Mechelen, BE 7 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00