Harvester feed housing cleaning with pressurized fluid

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9480203
APP PUB NO 20150366136A1
SERIAL NO

14686097

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A harvesting apparatus having a frame to be advanced over an area in which a crop is grown and a harvesting assembly on the frame configured to process severed crop. The harvesting assembly is configured to advance severed crop laterally to a delivery location between the laterally spaced sides of the frame and to and through a feed housing. A fluid delivery system discharges pressurized fluid to at least one of: a) facilitate severance of crop; and b) facilitate rearward advancement of severed crop. The fluid delivery system has at least a first pressurized fluid source through which pressurized fluid is delivered to laterally spaced outlets. A cleaning assembly has a first cleaning conduit assembly for directing pressurized fluid from the first pressurized fluid supply source in at least a first stream that repositions unusable crop and debris to reduce buildup thereof in the vicinity of the feed housing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CRARY INDUSTRIES INC237 12TH STREET NW WEST FARGO ND 58078

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cavkusic, Damir Fargo, US 5 4
Lee, Mitchell Fargo, US 5 4
Richard, Ben Fargo, US 6 8
Ross, Daniel Moorhead, US 28 193

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00