Quick-loading bow and arrow toy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9476666
SERIAL NO

14621336

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bow and arrow toy having a light-weight, foam tipped arrow and a bow with rear and fore tension bands. To load and arm the toy, the rear of the arrow is abutted against the rear tension band and the shaft of the arrow is pressed against the fore tension band and drawn back. As the arrow is drawn back, the shaft of the arrow slides against the fore tension band until the fore tension band falls into an engagement slot along the shaft, causing the fore tension band to also become engaged and tensioned as the arrow is drawn back further. At the fore outside edge of the engagement slot is a catch lip which protrudes outwards from the shaft and functions to guide the fore tension band into the engagement slot if the pressure of the shaft against the fore tension band is not sufficient to cause the fore tension band to slide directly into the engagement slot. The fore tension band is comprised of three interlinked loops, with the central loop being sleeved so as to narrow its effective diameter. The front profile of the fore tension band, from top to bottom, slants rearward, is vertical and slants forward, thereby providing physical guidance for proper horizontal orientation of the arrow. The sleeved central loop differs in color from the top and bottom loops of the fore tension band to facilitate proper horizontal orientation of the arrow.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LARNER COLE ERNESTNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Larner, Cole Ernest Portland, US 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00