System and method for generating electrical power

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9476326
APP PUB NO 20140265350A1
SERIAL NO

14215256

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for generating electrical power, including a frame defining a vertical axis and a horizontal axis, and having a support base generally extending along the longitudinal axis. The support base has an input end and an output end. At least a first shear station includes a first shearing blade adapted to reciprocate in a vertical direction between a first displaced position displaced from the support base and a second approximated position proximate the support base to shear the tree waste supported by the support base. An index blade is adapted for at least general horizontal movement along the support base. The index blade is dimensioned and adapted to direct the sheared tree waste toward the output end of the support base. A pulverizing station receives the sheared tree waste directed through the output end of the support base. The pulverizing station includes a pulverizing member actuable to pulverize the sheared tree waste. A furnace receives and converts the pulverized tree waste into steam energy. A steam generator turbine converts the steam energy into electricity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MULLER THOMAS RNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Muller, Thomas R Manorville, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00