Injection molding machine and method for controlling injection molding machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9475224
APP PUB NO 20130313746A1
SERIAL NO

13983926

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydraulic supply device of an injection molding machine is provided with: a first main hydraulic power source including a first main hydraulic pump having a variable capacity and driven by a first constant rotational speed motor, and a first main discharge pipe through which working oil flows; an auxiliary hydraulic power source including an auxiliary hydraulic pump driven by a servo motor and operated at a specific capacity, an auxiliary discharge pipe through which the working oil flows, and a check valve that regulates the inflow of working oil to the auxiliary hydraulic pump; a hydraulic control unit that controls the first main hydraulic power source and the auxiliary hydraulic power source; a junction pipe at which the first main discharge pipe and the auxiliary discharge pipe join; and a switching unit that switches the supply/non-supply of working oil for a hydraulic actuator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES PLASTIC TECHNOLOGY CO LTDNAGOYA-SHI AICHI 453-0862

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ikarashi, Masaaki Nagoya, JP 5 24
Kawasaki, Mamoru Nagoya, JP 5 62

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00