Gas-insulated switchgear arrangement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9472926
APP PUB NO 20130148268A1
SERIAL NO

13682290

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas-insulated switchgear bay includes at least three circuit breakers, which define a longitudinal direction, for interrupting conductor phases at different electrical potentials. The circuit breakers each have a first and second power connection, which define a first and second axis extending orthogonally to the longitudinal direction. A first busbar section is attachable to the first power connection, and the first busbar conductors thereof, each define a third axis, which extends orthogonally to the longitudinal direction and the first axis. A second busbar section is attachable to the second power connection, and the second busbar conductors thereof, each define a fourth axis, which extends orthogonally to the longitudinal direction and the first axis. A first distance between the first and second axes is such that the fourth axis is arranged with respect to position and orientation on a common straight line with the third axis in the second mounting state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABB POWER GRIDS SWITZERLAND AGBRUGGERSTRASSE 72 BADEN 5400

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bolli, Tilo Merlingen, CH 5 24
Keller, Markus Zurich, CH 41 213
Sabani, Arben Zurich, CH 4 16
Sologuren-Sanchez, Diego Wettingen, CH 13 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00