Energy chain, particularly for clean room applications

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9464689
APP PUB NO 20160061290A1
SERIAL NO

14778961

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention relates to an energy chain (100; 200 . . . 700) having a number of mutually articulated chain links (212; 312 . . . 812), at least some chain links present a housing (216; 316 . . . 816) for the feed-through of cables and hoses. Adjacent chain links are pivotable against each there by way of hinged connections in such a manner that between a fixed connector (105) and movable connector (107) of said energy chain a movable deflection zone (104) with a predetermined curvature is formed. The invention provides that a bendable tubular envelope (110; 210 . . . 810), in particular a corrugated hose or corrugated tube, surrounds the chain links in the circumferential direction and between said two connectors (105, 107) in a continuous manner. The envelope is supported and entrained by at least some chain links (212; 312 . . . 812) and is sufficiently flexible for absorbing the predetermined curvature of the deflection zone (104) and for following the reciprocating movement thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IGUS GMBHSPICHER STR 1A KOELN 51147

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barten, Dominik Meckenheim, DE 30 76
Hermey, Andreas Hennef, DE 66 296

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 11, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00