Power transmission device provided with more than two pistons and method of determining return spring force in the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9458896
SERIAL NO

14450460

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of determining a return spring load in a power transmission device including two or more pistons is disclosed. The power transmission device may include: a housing configured to form a mounting space; a clutch pack configured to include a plurality of separate plates splined to the housing, and a plurality of friction disks alternately disposed with the separate plates, the separate plates and the friction disks being selectively coupled to each other by friction; a power transmission plate configured to be splined to the friction disks; two or more pistons operatively connecting the housing to the power transmission plate by selectively applying an axial force to the clutch pack by an operating hydraulic pressure supplied to the piston chamber; and at least one return spring configured to provide a return spring load against an axial force caused by the operating hydraulic pressure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
C-STONE TECHNOLOGIES CO LTD#805 806 1004 91 CHANGNYONG-DAERO 256BEON-GIL YEONGTONG-GU GYEONGGI-DO SUWON-SI 16229

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Park, Dong-Hoon Seongnam-si, KR 37 185

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00