Heat engine and heat to electricity systems and methods with working fluid mass management control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9458738
APP PUB NO 20140096524A1
SERIAL NO

14102628

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Aspects of the disclosure generally provide a heat engine system and a method for regulating a pressure and an amount of a working fluid in a working fluid circuit during a thermodynamic cycle. A mass management system may be employed to regulate the working fluid circulating throughout the working fluid circuit. The mass management systems may have a mass control tank fluidly coupled to the working fluid circuit at one or more strategically-located tie-in points. A heat exchanger coil may be used in conjunction with the mass control tank to regulate the temperature of the fluid within the mass control tank, and thereby determine whether working fluid is either extracted from or injected into the working fluid circuit. Regulating the pressure and amount of working fluid in the working fluid circuit selectively increases or decreases the suction pressure of the pump to increase system efficiency.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ECHOGEN POWER SYSTEMS (DELWARE) INC16192 COASTAL HIGHWAY LEWES DE 19958

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Held, Timothy James Akron, US 35 1993
Hostler, Stephen Akron, US 6 419
Miller, Jason D Hudson, US 36 1271
Vermeersch, Michael Hamilton, US 4 249
Xie, Tao Copley, US 149 1890

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00