Power source control device and vulcanizing system including power source control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9457527
APP PUB NO 20150246493A1
SERIAL NO

14369048

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power source control device (401) supplies electrical power for performing vulcanizing processing of a green tire in at least one vulcanizing unit provided in the vulcanizing machine (300), from a first power source (100) capable of supplying continuous power and a second power source (200) capable of supplying charged power that is charged in advance. The power source control device (401) includes an information acquisition unit (412) and a power supply control unit (413). The information acquisition unit (412) acquires process information showing the kind of processes included in the vulcanizing processing in the vulcanizing unit (301). The power supply control unit (413) makes the charged power supplied from the second power source (200) to the vulcanizing unit (300) during a predetermined process, on the basis of the process information acquired by the information acquisition unit (412).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES MACHINERY TECHNOLOGY CORPORATIONHIROSHIMA 733-8553

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shintani, Koji Hiroshima, JP 12 11
Tanaka, Kazunari Tokyo, JP 42 243
Yokoo, Kazutoshi Tokyo, JP 18 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00