Composite substrate manufacturing method, semiconductor element manufacturing method, composite substrate, and semiconductor element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9455229
SERIAL NO

14397400

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a composite substrate manufacturing method, including at least: a first raw board deforming step of preparing a first substrate by deforming a first raw board having at least one surface as a minor surface into a state in which the minor surface warps outward; and a joining step of joining, after the first raw board deforming step, a protruding surface of the first substrate and one surface of a second substrate to each other, thereby manufacturing a composite substrate including the first substrate and the second substrate, in which the second substrate is any one substrate selected from a substrate having both surfaces as substantially flat surfaces and a substrate that warps so that a surface thereof to be joined to the first substrate warps outward. Also provided are a semiconductor element manufacturing method, a composite substrate and a semiconductor element manufactured.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ORBRAY CO LTDTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aida, Hideo Tokyo, JP 23 73
Aota, Natsuko Tokyo, JP 11 51
Honjo, Keiji Tokyo, JP 14 43
Hoshino, Hitoshi Tokyo, JP 52 424
Ogasawara, Mai Tokyo, JP 2 9
Takeda, Hidetoshi Tokyo, JP 44 682

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00