Uninterruptible power supply system with energy feedback to chargers and sinusoidal output

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9450453
APP PUB NO 20150061395A1
SERIAL NO

14016169

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An uninterruptible power supply (UPS) system with energy feedback to chargers and sinusoidal output charges a battery pack through a first charger under a mains mode. Under a battery mode, the UPS boosts DC voltage outputted from the battery pack to a higher voltage level through a DC-to-DC conversion module, converts the DC voltage to a sinusoidal AC voltage through a DC-to-AC conversion module, and supplies the sinusoidal AC voltage to a load. When the load has energy storage elements and discharged energy occurs in a power supply loop, a micro-controller unit can control the discharged power to charge the battery pack through a second charger, thereby solving the issue of the discharged power from the energy storage elements of the load and enhancing the operational efficiency of the UPS.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CYBER POWER SYSTEMS INC6F NO 32 SEC 1 CHENGGONG RD NANGANG DIST TAIPEI R O C

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chi, Shih-Chin Taipei, TW 2 2
Liu, Yen-Nan Taipei, TW 4 6
Lo, Cheng-Yen Taipei, TW 3 4
Yeh, Shou-Ting Taipei, TW 17 192

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00