Manufacturing method of pixel structure with data line, scan line and gate electrode formed on the same layer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9449998
APP PUB NO 20160111446A1
SERIAL NO

14977562

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pixel structure and a manufacturing method thereof are provided. The pixel structure includes a substrate, a scan line, a data line, a first insulating layer, an active device, a second insulating layer, a common electrode and a first pixel electrode. The data line crossed to the scan line is disposed on the substrate and includes a linear transmitting part and a cross-line transmitting part. The first insulating layer covering the scan line and the linear transmitting part is disposed between the scan line and the cross-line transmitting part. The active device, including a gate, an oxide channel, a source and a drain, is connected to the scan line and the data line. The second insulating layer is disposed on the oxide channel and the linear transmitting part. The common electrode is disposed above the linear transmitting part. The first pixel electrode is connected to the drain.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AU OPTRONICS CORPORATIONHSIN-CHU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Kuo-Yu Hsinchu County, TW 48 282
Huang, Te-Chun New Taipei, TW 13 108
Lin, Hsiang-Lin Changhua County, TW 61 392

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00