X-ray analyzer having multiple excitation energy bands produced using multi-material x-ray tube anodes and monochromating optics

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9449780
APP PUB NO 20150043713A1
SERIAL NO

14381023

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An x-ray tube includes a target on which electrons impinge to form a diverging x-ray beam. The target has a surface formed from first and second target materials, each tailored to emit a respective x-ray energy profile. A first x-ray optic may be provided for directing the beam toward the sample spot, the first x-ray optic monochromating the diverging x-ray beam to a first energy from the energy emitted by the first target material; and a second x-ray optic may be provided, for directing the beam toward the sample spot, the second x-ray optic monochromating the diverging x-ray beam to a second energy from the energy emitted by the second target material. Fluorescence from the sample spot induced by the first and second monochromated energies is used to measure the concentration of at least one element in the sample, or separately measure elements in a coating and underlying substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
X-RAY OPTICAL SYSTEMS INC15 TECH VALLEY DRIVE EAST GREENBUSH NY 12061

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Zewu Schenectady, US 32 820

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00