Methods for suppressing cancer by inhibition of TMCC3

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9447193
APP PUB NO 20140363372A1
SERIAL NO

14223800

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for treating cancer includes administering to a subject in need thereof an antibody against a transmembrane and coiled-coil domains protein 3 (TMCC3), wherein the antibody binds to an epitope in an extracellular domain of TMCC3. The antibody binds to an epitope in an intercoil domain of TMCC3. A method of diagnosing or assessing a cancer condition includes assessing a level of expression or activity of a transmembrane and coiled-coil domains protein 3 (TMCC3) in a sample, wherein an increase in the level of expression of activity of TMCC3 as compared to a standard indicates the presence of cancer stem cells in the sample.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHANG GUNG MEMORIAL HOSPITALTAOYUAN
ACADEMIA SINICANO 128 ACADEMIA ROAD SECTION 2 NANKANG TAIPEI CITY 115
DEVELOPMENT CENTER FOR BIOTECHNOLOGYNO 101 LN 169 KANGNING ST XIZHI DIST NEW TAIPEI CITY 221

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yi-Chang New Taipei, TW 76 696
Hsu, Chuan-Lung New Taipei, TW 7 2
Lok, Ying-Yung New Taipei, TW 5 6
Wang, Ya-Hui New Taipei, TW 8 22
Yu, Alice L New Taipei, TW 20 165
Yu, John New Taipei, TW 34 380

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00