Non-contact discharge evaluation method and non-contact discharge evaluation apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9442154
APP PUB NO 20140361789A1
SERIAL NO

14374424

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The magnitude (charge quantity) and energy of discharge are obtained by optical measurement based on light emission, and are evaluated. A discharge source is caused to emit discharge light by applying a voltage to the discharge source from a known power supply, the intensity waveform of the discharge light emission is measured using a light receiving element, the waveform of discharge current is simultaneously measured using a current conversion probe or a current waveform detector, and a database is created in which a relation with analysis data sets obtained by analyzing the waveforms is recorded in consideration of applied power information. The intensity waveform of discharge light emission from a piece of equipment under measurement is measured using the light receiving element, and light emission data obtained by analyzing the waveform is compared with the data recorded in the database so as to estimate the magnitude of discharge as a value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KYUSHU INSTITUTE OF TECHNOLOGYFUKUOKA PREFECTURE FUKUOKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furukawa, Masaaki Fukuoka, JP 44 96
Ohtsuka, Shinya Fukuoka, JP 12 51
Yamaguchi, Yuki Fukuoka, JP 36 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00