Yarn clipping and cutting structure for striping apparatus of circular knitting machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9441317
SERIAL NO

14731204

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A yarn clipping and cutting structure for a striping apparatus of a circular knitting machine, including two yarn clipping and cutting drive blades that abut each other and can be driven synchronously. A first yarn clipping and cutting drive blade is bordered by a yarn feeding blade. The first yarn clipping and cutting drive blade and the yarn feeding blade are interposed by a yarn clipping blade. The first yarn clipping and cutting drive blade has a first end edge formed a first yarn picking portion which has a directing section. A second yarn clipping and cutting drive blade has another side opposing the yarn clipping blade with a yarn cutting blade. The second yarn clipping and cutting drive blade has a second end edge formed a second yarn picking portion. The second yarn picking portion has a spaced section to form an elevation difference against the directing section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PAI LUNG MACHINERY MILL CO LTDNO 8 TING-PING RD RUIFANG DISTRICT NEW TAIPEI CITY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Peng Cheng New Taipei, TW 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00