Control systems for optical devices and subassemblies

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9438355
SERIAL NO

13942519

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention describes systems 1, 12 and methods for control of optical devices and communications subsystems. The control system comprises ASIC sub-modules and programmable circuitry 25 which may be integrated into a self-contained, stand-alone module. In one embodiment, the module has one or more FPGAs 25 in conjunction with RF and Digital ASICs 30, an integrated cross-connect 36 between the FPGA and digital and RF ASIC building blocks, and an integrated cross-connect 41 between the ASIC and optical circuits and supporting functions. Programmable chip control and other transmission and tuning functions, programmable transponders, and each FPGA/ASIC 25, 30 that is incorporated into a transponder form factor or a host board, can have the same or different functionalities and other parameters including but not limited to modulation format.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OE SOLUTIONS CO LTD53 CHEOMDANYEONSIN-RO 30 BEON-GIL BUK-GU GWANGJU 500-190

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blumenthal, Daniel Jacob Santa Barbara, US 7 136
Poulsen, Henrik N Santa Barbara, US 5 83

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00