Method of manufacturing components of display panel assembly from same mother substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9437621
APP PUB NO 20160204127A1
SERIAL NO

14946936

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a display panel assembly includes: preparing a mother substrate on which are defined first regions and dummy regions respectively between adjacent first regions; forming pixel driving lines and pixels connected to the pixel driving lines on each of the first regions in a same process at the same time as forming circuit connection lines on each of the dummy regions; connecting a driving element which drives the pixels to the circuit connection lines of the dummy regions; dividing the mother substrate to separate the first regions and the dummy regions from each other, each of the separated first regions defining a thin film transistor board of the display panel assembly, and each of the separated dummy regions defining a driving circuit board of the display panel assembly; and connecting the driving circuit board to the thin film transistor board.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG DISPLAY CO LTDSOUTH KOREA GYEONGGI DO YONGIN YONGIN GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Sang-myoung Seoul, KR 35 181
Seo, Osung Seoul, KR 15 53
Yu, Seungjun Cheonan-si, KR 8 70

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00