Dam construction method utilizing refrigeration technique

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9435092
APP PUB NO 20110033241A1
SERIAL NO

12988799

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A dam construction method utilizing refrigerating technology is provided, the method takes natural water as the material to construct the dam and constructs an ice dam body by utilizing the refrigerating technology. The method includes the following steps: choosing the forms and quantity of ice unit bodies, determining the positions and quantity of frozen contact points, manufacturing sufficient ice unit bodies by frozen units, choosing heat insulating material with high performance as the heat preservation layer to cover on the outside of the frozen ice unit bodies; temporarily fixing the ice unit bodies; quickly freezing the seams of the ice unit bodies to form a whole ice dam; mounting temporary generating equipment and completing the temporary dam body; thawing the ice dam body after a permanent dam body is completed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YANG JU212400 ZHENJIANG CITY JIANGSU PROVINCE JURONG CITY HUAYANG ZHEN TAO JIA CUN ZHENJIANG CITY JIANGSU PROVINCE 212400

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yang, Guan Jurong, CN 6 36
Yang, Ju Jurong, CN 72 605

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00