Titanium metal production apparatus and production method for titanium metal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9435007
APP PUB NO 20130255443A1
SERIAL NO

13988625

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A titanium metal production apparatus is provided with (a) a first flow channel that supplies magnesium in a state of gas, (b) a second flow channel that supplies titanium tetrachloride in a state of gas, (c) a gas mixing section in which the magnesium and titanium tetrachloride in a state of gas are mixed and the temperature is controlled to be 1600° C. or more, (d) a titanium metal deposition section in which particles for deposition are arranged so as to be movable, the temperature is in the range of 715 to 1500° C., and the absolute pressure is 50 kPa to 500 kPa, and (e) a mixed gas discharge section which is in communication with the titanium metal deposition section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI METALS LTD2-1 SHIBAURA 1-CHOME MINATO-KU TOKYO 105-8614
TEKNA PLASMA SYSTEMS INC2935 INDUSTRIAL BOUL SHERBROOKE J1L 2T9

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boulos, Maher I Sherbrooke, CA 35 1113
Fukumaru, Mariko Yasugi, JP 1 6
Guo, Jiayin Sherbrooke, CA 19 275
Han, Gang Yasugi, JP 66 364
Jurewicz, Jerzy Sherbrooke, CA 20 784
Shoji, Tatsuya Yasugi, JP 17 128
Uesaka, Shujiroh Yasugi, JP 10 58

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00