Continuous processes for hydrolyzing hemicelluloses from ligocellulosic materials with cleaning system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9435002
APP PUB NO 20150354019A1
SERIAL NO

14714214

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A continuous process for producing hemicellulose sugars from a biomass extraction liquor is provided. A system is configured for continuously producing hemicellulose sugars and/or hemicellulose derivatives from a biomass extraction liquor, the system comprising at least a first hydrolysis reactor and a second hydrolysis reactor. Each of the hydrolysis reactors is in switchable communication with (i) an operating feed stream of a biomass extraction liquor containing water, hemicellulose oligomers, and dissolved or suspended lignin, and (ii) a cleaning feed stream of a cleaning agent selected from the group consisting of steam, an alkaline solution, an organic solvent, and combinations thereof. The cleaning agent dissolves precipitated lignin formed from the lignin under the hydrolysis reaction conditions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GRANBIO INTELLECTUAL PROPERTY HOLDINGS LLC300 MCINTOSH PARKWAY IP DEPT THOMASTON GA 30286

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dang, Zheng Lilburn, US 9 8
Tunc, Mehmet Sefik Thomaston, US 5 7
Wang, Ziyu Newnan, US 34 121

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00