Gas turbine generator with a pre-combustion power turbine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9431875
APP PUB NO 20150275691A1
SERIAL NO

14229677

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A turbine generator uses a common bearing carrier to support a high-speed spool and a low-speed spool, thereby enabling a more axially compact turbine generator design. The high-speed spool includes a high-speed compressor assembly mechanically powered by a high-speed turbine, which receives power from a combustion chamber between the high-speed turbine and the high-speed compressor assembly. The low-speed spool includes a pre-combustion power turbine aerodynamically powered by the compressor assembly and upstream of the combustion chamber. The pre-combustion turbine mechanically powers an electrical generator, which includes coreless stators and a rotor assembly. The stators have a planar configuration to receive axial flux from magnets of the rotor assembly. Optionally, the low-speed spool may include a post-combustion turbine that is arranged downstream of the combustion chamber and that mechanically powers the electrical generator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCALED POWER CORP1501 MARIPOSA STREET SUITE 416 SAN FRANCISCO CA 94107

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Keogh, Rory Colm San Francisco, US 1 21
Thomas, Gregory San Francisco, US 17 211

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00