Load isolation consumption management systems and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9431827
SERIAL NO

13460538

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein are power management systems for controlling recorded electrical demand by isolating loads from a utility distribution grid connection. The loads are isolated when an energy storage system (ESS) is placed in series between the loads and the grid, with a charger that keeps the ESS from depleting and a power converter that provides energy to the loads from the ESS. A system controller may be enabled to manage the charging of the ESS by the charger relative to a consumption metric. In some embodiments, the loads are categorized, controlled, or curtailed by the controller and may be isolated from other loads. Some embodiments include bypass features or bimodal connections. Additional methods of control to prevent depletion of the ESS are also set forth. Systems herein can prevent or limit demand charges, protect the utility grid from backflow and other dangers, and raise the customer's effective utility service limit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENGIE STORAGE SERVICES NA LLC4151 BURTON DR SANTA CLARA CA 95054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chow, Bryan Brooklyn, US 5 100
Weiner, Joshua Sausalito, US 8 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00