Water heater having a down fired combustion assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9429337
APP PUB NO 20150144075A1
SERIAL NO

14091879

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a water heater that has a water storage tank, a first pass flue tube extending from a top of the water storage tank to a bottom of the water storage tank, a down-fired burner assembly positioned to direct combustion gases into the first pass flue tube, a plurality of second pass flue tubes extending from the bottom of the water storage tank to a top of the water storage tank, and an expansion chamber positioned below the bottom of the water storage tank. The expansion chamber receives the combustion gases from the first pass flue tube and delivers the combustion gases to the second pass flue tubes. The water heater operates with a non-positive vent static pressure and with a vent gas temperature that avoids or reduces excessive condensate production in an exhaust vent connected to receive combustion gases from the water heater.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BRADFORD WHITE CORPORATION725 TALAMORE DRIVE AMBLER PA 19002

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lannes, Eric M Caledonia, US 29 343
Stafford, Christopher P Hastings, US 2 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00