Manufacturing a flexible structure by transfers of layers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9427948
APP PUB NO 20130156989A1
SERIAL NO

13718037

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a flexible structure including implanting ionic species in first and second source substrates so as to form first and second embrittlement regions respectively, delimiting first and second thin films, providing a flexible substrate, the stiffness R of which is less than or equal to 107 GPa·μm3, securing the first and second thin films to the first and second faces of the flexible substrate respectively so as to form a stack including the flexible structure delimited by the first and second embrittlement regions, the flexible structure having a stiffening effect suitable for allowing transfers of the first and second thin films, and applying a thermal budget so as to transfer the first and second thin films onto the flexible substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVESPARIS FRA PARIS PARIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Argoud, Maxime Lyons, FR 11 41
Fournel, Frank Villard-Bonnot, FR 65 226
Mazen, Frederic Grenoble, FR 15 118
Morales, Christophe St Pierre de Mesage, FR 27 210
Moriceau, Hubert Saint-Egreve, FR 93 2315

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00