Process for the conversion of a feed containing biomass for the production of hydrocarbons, by Fischer-Tropsch synthesis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9422492
APP PUB NO 20150275112A1
SERIAL NO

14439328

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention concerns an integrated process for the production of liquid hydrocarbons starting from a feed containing at least one fraction of biomass and optionally at least one fraction of another feed, said process comprising at least one pre-treatment step, a gasification step, a step for conditioning synthesis gas, a water scrubbing step, a step for eliminating acid gases, a final purification step, and a catalytic Fischer-Tropsch synthesis reaction step.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOTALENERGIES ONETECHLA DÉFENSE 6 2 PLACE JEAN MILLIER 92400 COURBEVOIE 92400

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Avenier, Priscilla Grenoble, FR 9 26
Boissonnet, Guillaume Grenoble, FR 3 103
Bournay, Laurent Chaussan, FR 26 220
Chiche, David Lyons, FR 18 53
Fedou, Stéphane Paris, FR 2 12
Hecquet, Michael Octeville sur Mer, FR 3 37
Heraud, Jean-Philippe Saint Pierre de Chandieu, FR 10 23
Lemaire, Raphael Paris, FR 1 9
Lucquin, Anne Claire Saint Maurice L'exil, FR 2 15
Rousseau, Julien Paris, FR 1 9
Ullrich, Norbert Essen, DE 15 94
Viguie, Jean-Christophe Lyons, FR 12 84

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00