Power tool and operation method for the power tool

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9421681
APP PUB NO 20130032368A1
SERIAL NO

13628580

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power tool, including: a housing, a motor, arranged in the housing and outputting rotary force, a connecting shaft, adapted to one of a plurality of tool bits, a transmission mechanism, arranged between the motor and the connecting shaft and transmitting the rotary force from the motor to the connecting shaft, a cartridge, the cartridge includes a tool chamber for receiving the plurality of tool bits, the connecting shaft being capable of moving axially between a working position wherein the connecting shaft is adapted to the tool bits and a release position wherein the connecting shaft is separated from one of the plurality of tool bits, and a restricting member, the restricting member operable to move between two positions; at a first position, the restricting member limits the movement of the connecting shaft; and at a second position, the restricting member allows the connecting shaft to move.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POSITEC POWER TOOLS (SUZHOU) CO LTD215123 JIANGSU PROVINCE SUZHOU CITY INDUSTRIAL PARK EAST ROAD NO 18 SUZHOU CITY JIANGSU PROVINCE 215123

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andriolo, Paolo Vicenza, IT 64 807
Chen, Zhi Suzhou, CN 223 2316
Pang, Xiaoli Suzhou, CN 16 105
Wang, Kelvin Suzhou, CN 5 23
Xu, Jingtao Suzhou, CN 60 298
Zhang, Shisong Suzhou, CN 53 469
Zhong, Hongfeng Suzhou, CN 49 417

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00