Mammography detector having multiple sensors, and mammography device capable of acquiring 3D image acquisition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9420982
APP PUB NO 20140205060A1
SERIAL NO

14130574

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure relates to a mammography device including a main body, a gantry, an X-ray generator, an X-ray detector, a first rotating shaft, a supporting panel, and a pressing panel. The gantry is vertically movably connected to the main body. The X-ray generator is attached to one end of the gantry. The X-ray detector is attached to the other end of the gantry. The first rotating shaft is configured to rotate the gantry. The support panel is configured to support a patient's breast. The pressing panel is vertically movably disposed and connected to the main body. Such a pressing panel is configured to press the patient's breast on the support panel. The X-ray detector acquires 3-D images while rotating the gantry around the breast pressed by the pressing panel and the support panel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RAYENCE CO LTD14 SAMSUNG 1-RO 1-GIL HWASEONG-SI 18449
VATECH EWOO HOLDINGS CO LTD13 SAMSUNG 1-RO 2-GIL HWASEONG-SI 18449

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Chang Hyeuk Seoul, KR 2 6
Kim, Tae Woo Gyeonggi-do, KR 270 1153

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00