Hydraulic system for collecting crop grain and crop residue in a single pass

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9420744
APP PUB NO 20160192589A1
SERIAL NO

14591333

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A harvesting system for collecting crop grain crop residue in a single pass with a baler towed by a combine harvester is provided. The system includes a hydraulic system that hydraulically interconnects the combine harvester with the baler, allowing the engine of the combine harvester to hydraulically power systems and components of both the combine harvester and the baler. The hydraulic system may include a combine hydraulic system and a baler hydraulic system which may be hydraulically connected through multiple interconnections for hydraulically powering different functions of the baler using hydraulic pressure that is generated at the combine harvester. A first combine-to-baler hydraulic interconnection may transfer hydraulic power from a combine primary baler drive hydraulic circuit to a baler drive hydraulic circuit. A second combine-to-baler hydraulic interconnection may transfer hydraulic power from a combine spreader hydraulic circuit to a baler conveyor and/or auxiliary hydraulic.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BLUE LEAF I P INC1100 N MARKET STREET 4TH FLOOR SUITE 4010 WILMINGTON DE 19890

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Bruce E Lancaster, US 15 146
Foster, Christopher A Mohnton, US 96 1554

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00