Management of operation of PEM-fuel-cell-stack backup electric generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9419292
APP PUB NO 20120258376A1
SERIAL NO

13518002

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A PEM-fuel-cell-stack backup electric generator comprising: a fuel-cell stack, formed by a plurality of stacked PEM fuel cells electrically connected in series for supplying electrical energy to an electrical load; a cell-voltage monitor for measuring the voltage supplied by each fuel cell; an electrical-energy management and conditioning unit, connected between the fuel-cell stack and the electrical load; a blower for supplying the amount of air necessary for the chemical reactions that occur in the fuel cells; a hydrogen recirculator for recirculating hydrogen between the outlet and the inlet of the fuel-cell stack; a hydrogen-purging device for carrying out a primary purging of hydrogen at a lower flow rate, and a secondary purging of hydrogen at a higher flow rate; and a controller, programmed for managing operation of the electric generator differently at start-up, at shut-down, and during normal operation thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELECTRO POWER SYSTEMS MANUFACTURING S R L20129 MILANO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cherchi, Pierpaolo Turin, IT 8 6
Gianolio, Giuseppe Cellarengo, IT 9 16
Pedrazzo, Francesco Cuneo, IT 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00