Gas supply pressure spikes are absorbed and leveled-out by a gas supply shock absorber comprising gas storage, which is charged during positive pressure spikes and utilized during negative pressure spikes. The gas supply shock absorber also comprises pressure sensing and regulating valves, which direct positive pressure spikes to the gas storage and draw gas from storage during negative pressure spikes. A backflow preventer limits shock absorption to co-located equipment, but gas supply shock absorbers operate in aggregate to create additional demand during positive pressure spikes and reduced demand during negative pressure spikes. If the gas storage has sufficient gas, a co-located data center utilizes such gas for increased electrical power generation during increased processing activity, which can be requested or generated. Conversely, if the gas storage has insufficient gas, and a negative pressure spike occurs, the data center throttles down or offloads processing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MICROSOFT TECHNOLOGY LICENSING LLCONE MICROSOFT WAY REDMOND WA 98052

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Belady, Christian L Mercer Island, US 220 5227
James, Sean M Olympia, US 26 522

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00