Super-piezoelectric composite fiber mats for power generation and soft actuators

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9416487
APP PUB NO 20150102704A1
SERIAL NO

14051763

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A piezoelectric device includes a fiber mat comprising polymer fibers with ferroelectric particles embedded in the polymer fibers. The ferroelectric particles are oriented to generate a net polarization in the fiber mat. The ferroelectric particles may comprise barium titanate particles. The polymer fibers may comprise polylactic acid (PLA) fibers. The piezoelectric device may further include substrates sandwiching the fiber mat, and the fiber mat may be formed by electrospinning polymer fibers containing ferroelectric particles onto one of the substrates. The piezoelectric device may be a piezoelectric actuator configured to receive an input voltage applied across the fiber mat and to output a mechanical displacement in response to the voltage, or the piezoelectric device may be configured to output a voltage in response to a mechanical force applied to the fiber mat.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KENT STATE UNIVERSITY145 CARTWRIGHT HALL P O BOX 5190 KENT OH 44242

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Buyuktanir, Ebru Aylin Massillon, US 1 3
Harden,, Jr John Ernest Streetsboro, US 6 8
Jakli, Antal I Kent, US 5 12
Morvan, Jason Twinsburg, US 1 3
West, John L Harville, US 25 1004

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00