Renewable carbon content in methanol and other products from gasification of biomass

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9416077
APP PUB NO 20140080928A1
SERIAL NO

14026768

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated plant is provided to improve carbon utilization of carbon molecules from gasified woody biomass to be converted into methanol. Detectors ensure a minimized sulfur content of less than 0.05% by dry weight of the woody biomass. A biomass gasifier reacts woody biomass in a rapid gasification reaction to produce a syngas composition having a ratio of hydrogen to carbon dioxide that is higher than needed for methanol synthesis. Parallel to the gasifier, a hydrocarbon reforming reactor provides a syngas composition having a ratio of hydrogen to carbon monoxide that is higher than needed for methanol synthesis. The combined syngas mixture from the biomass gasifier and the hydrocarbon reforming reactor comprises feed to a methanol synthesis plant, such that a majority of the carbon dioxide produced by the biomass gasification reaction and the hydrogen produced by the hydrocarbon reforming reactor are synthesized into methanol.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUNDROP IP HOLDINGS LLC10515 MOORING RD LONGMONT CO 80504

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kelfkens, Renus Constantyn Longmont, US 2 42
Kosstrin, Herbert Mark Wellesley, US 1 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00