Heat source system and method of controlling flow rate of heating medium thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9414521
APP PUB NO 20140360714A1
SERIAL NO

14365939

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

It is possible to realize flow rate control regardless of the scale on a load side or a piping system and to achieve energy saving. In a host control device (20) of a heat source system, a bypass valve opening command value is determined by an opening command value determination unit (22) such that a header differential pressure matches a target differential pressure value, and a target opening value according to the header differential pressure or the behavior of the bypass valve opening is set by a target opening value setting unit (24). A heating medium flow rate set value is determined by a heating medium flow rate setting unit (23) using the target opening value set by the target opening value setting unit (24) and the opening command value determined by the opening command value determination unit (22).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES THERMAL SYSTEMS LTDSANTINGMU NO 2 FAN NO 3 TAKESHITA PILLS THE CAPITAL OF TOKYO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsuo, Minoru Tokyo, JP 70 496
Nikaido, Satoshi Tokyo, JP 27 75
Ouchi, Toshiaki Tokyo, JP 20 79
Tateishi, Koki Tokyo, JP 28 50

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00