Memory device, semiconductor device, method for producing memory device, and method for producing semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9412938
SERIAL NO

15019441

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device includes a first pillar-shaped semiconductor layer and a gate insulating film around the first pillar-shaped semiconductor layer. A gate electrode is around the gate insulating film and a gate line is connected to the gate electrode. A first diffusion layer resides in an upper portion of the first pillar-shaped semiconductor layer and a second diffusion layer resides in a lower portion of the first pillar-shaped semiconductor layer. A memory device on the first diffusion layer includes a pillar-shaped phase-change layer and a reset gate insulating film surrounding the pillar-shaped phase-change layer. A reset gate surrounds the reset gate insulating film, where the reset gate functions as a heater, and the pillar-shaped phase-change layer and the reset gate are electrically insulated from each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNISANTIS ELECTRONICS SINGAPORE PTE LTDSINGAPORE 179098

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Masuoka, Fujio Tokyo, JP 412 6771
Nakamura, Hiroki Tokyo, JP 382 4527

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00