Bicycle pedal structure capable of triggering auxiliary power

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9409623
SERIAL NO

14732922

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bicycle pedal structure capable of triggering auxiliary power includes a base, sleeve unit, crank shaft, pedal cranks and treading force sensing unit. The sleeve unit has first and second sleeves disposed in two openings of the base. The crank shaft is fitted in the first and second sleeves and thus rotatably disposed in the base. The pedal cranks are coupled to two ends of the crank shaft, extend in opposite directions, are substantially perpendicular to the crank shaft, and each have a pedal for rotating the crank shaft under a treading force. The treading force sensing unit has piezoelectric plates disposed on at least the first and second sleeves and above the crank shaft. The bicycle pedal structure is mounted on a bicycle chassis and connected to a driving-controlling system to trigger the driving-controlling system to generate and supply digit modularized auxiliary power to the bicycle pedal structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MOTIVE POWER INDUSTRY CO LTDNO 66 SHANJIAO RD FU-SING VILLAGE DACUN TOWNSHIP CHANGHUA COUNTY 515

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Hsin-Lin Dacun Township, TW 12 8
Teng, Ching-Chung Dacun Township, TW 7 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00