Cooling tower nozzle and methods of assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9404688
APP PUB NO 20150048527A1
SERIAL NO

14448054

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Cooling tower nozzle assemblies and methods of assembly are provided herein. In some embodiments, a cooling tower nozzle assembly includes a body having an opening extending through the body from a first end to a second end; a support arm extending from the body and comprising a disk disposed on a first portion of the support arm opposite the first end of the body; a splash plate coupled to the disk, the splash plate having a bottom surface including a plurality of legs extending away from the bottom surface, wherein the plurality of legs have radially inwardly facing portions spaced a first distance from a central axis of the splash plate and aligned with the disk, and wherein the plurality of legs include features to interconnect to the disk; and a screw disposed through the splash plate to couple the splash plate to the support arm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMERTECH TOWERSERVICES LLC149 AVENUE AT THE COMMON SUITE 3 SHREWSBURY NJ 07702

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gaeta, Mark A Lincroft, US 1 0
Tweedle, Alan Garwood, US 1 0
Weber, Art Readington, US 1 0
Weber, Jason West Amwell, US 18 97
Weber, William Point Pleasant, US 20 516

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00