Bearing cup and cross shaft joint

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9404530
APP PUB NO 20140370994A1
SERIAL NO

14306758

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cross shaft joint includes a bearing cup, a cross shaft, and a joint yoke. The bearing cup includes a cylindrical portion in which an opening portion for receiving a shaft portion is formed in one end of the cylindrical portion in an axis direction, and a bottom portion that closes the other end of the cylindrical portion in the axis direction. The bearing cup is press-fitted into the fitting hole and supports the shaft portion through a rolling element so that the shaft portion is able to rotate. The bearing cup is fitted onto the shaft portion inside the fitting hole and holds the rolling element with the shaft portion. A diameter of an inner peripheral surface of the cylindrical portion is smaller on the opening portion side than the bottom portion side in a free state of the bearing cup before being press-fitted into the fitting hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JTEKT CORPORATIONJAPAN OSAKA
KOYO MACHINE INDUSTRIES CO LTD2-34 MINAMI UEMATSU-CHO YAO-SHI OSAKA 581-0091

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hashimoto, Kenichi Oume, JP 50 1102
Kobayashi, Hiroshi Hachioji, JP 902 9719
Kobayashi, Masanori Kitakatsuragi-gun, JP 228 2284
Koyama, Takeshi Neyagawa, JP 148 1588
Kusano, Hirotsugu Kashihara, JP 9 135

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00