Carbon nanotube and production method therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9403683
APP PUB NO 20130224483A1
SERIAL NO

13882834

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides CNT, in particular CNT having inherent properties thereof, which has a thin wall and does not form a bundle, and an efficient production method of the CNT. The method is for producing CNT, the whole length or a part thereof is compressed to form a band, said method comprises preparing a powdery and/or particulate material of an organic compound pre-baked to an extent of containing remaining hydrogen and allowed to carry a catalyst, which may be a transition metal, other metal or other element, thereon; charging the powdery and/or particulate material of the organic compound in a closed vessel made of a heat resistant material; and subjecting the powdery and/or particulate material of the organic compound together with the vessel to hot isostatic pressing treatment using a compressed gas atmosphere, wherein a maximum ultimate temperature at the hot isostatic pressing treatment is 750 to 1200° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INCUBATION ALLIANCE INC2-2-402 WAKIHAMACHO 1-CHOME CHUO-KU KOBE-SHI HYOGO 651-0072

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Muramatsu, Kazuo Kobe, JP 44 876

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00