Hybrid electrical-optical data communications cable with wireline capacitance compensation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9397750
SERIAL NO

14322683

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A communications cable is disclosed. The cable includes a first circuit configured to receive electrical data signals from a data source via an input connector, and convert the electrical data signals into optical signals for transmission by way of one or more optical fibers. The cable includes a second circuit configured to convert the optical signals received via the one or more optical fibers back to electrical data signals for providing to a data sink via an output connector. The cable includes a third circuit for applying pre- and post-signal conditioning to bi-directional control data for transmission to and received from the data sink via wires. The cable includes a fourth circuit for applying pre-and post-signal conditioning to bi-directional control data for transmission to and received from the data source via wires. The pre- and post-signal conditioning compensate for capacitance and/or resistance effects on the signals introduced by the wires.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MOBIX LABS INC15420 LAGUNA CANYON ROAD SUITE 100 IRVINE CA 92618

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuo, Chien-Yu Irvine, US 19 642
Nguyen, Nguyen X Irvine, US 16 168
Parekh, Devang Sunnyvale, US 22 116

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00