Method for producing semiconductor device and semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9390978
APP PUB NO 20150348846A1
SERIAL NO

14823138

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A SGT production method includes a step of forming first and second fin-shaped silicon layers, forming a first insulating film, and forming first and second pillar-shaped silicon layers; a step of forming diffusion layers by implanting an impurity into upper portions of the first and second pillar-shaped silicon layers, upper portions of the first and second fin-shaped silicon layers, and lower portions of the first and second pillar-shaped silicon layers; a step of forming a gate insulating film and first and second polysilicon gate electrodes; a step of forming a silicide in upper portions of the diffusion layers formed in the upper portions of the first and second fin-shaped silicon layers; and a step of depositing an interlayer insulating film, exposing and etching the first and second polysilicon gate electrodes, then depositing a metal, and forming first and second metal gate electrodes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNISANTIS ELECTRONICS SINGAPORE PTE LTDSINGAPORE 179098

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Masuoka, Fujio Tokyo, JP 412 6771
Nakamura, Hiroki Tokyo, JP 382 4527

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 12, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00