Semiconductor crystal removal apparatus and production method for semiconductor crystal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9388506
APP PUB NO 20140000509A1
SERIAL NO

13918721

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a semiconductor crystal removal apparatus which realizes effective removal of a semiconductor crystal from a crucible through rapid melting of a solidified flux, and a method for producing a semiconductor crystal. The semiconductor crystal removal apparatus includes a crucible support for supporting a crucible so that the opening of the crucible is directed downward; a heater for heating the crucible supported on the crucible support; and a semiconductor crystal receiving net for receiving a semiconductor crystal falling from the opening of the crucible. The semiconductor crystal removal apparatus further includes a determination portion for determining removal of the semiconductor crystal on the basis of a change in weight through falling of the semiconductor crystal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYODA GOSEI CO LTD1 HARUHINAGAHATA KIYOSU-SHI AICHI-KEN 452-8564

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Moriyama, Miki Kiyosu, JP 40 239
Nagai, Seiji Kiyosu, JP 49 1263
Yamazaki, Shiro Kiyosu, JP 83 903

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 12, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00