Plant for producing cement with central grinding unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9388073
APP PUB NO 20130277471A1
SERIAL NO

13977403

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A plant for producing cement, having a first stage for crushing raw material to form raw powder, a second stage for calcination and sintering of the raw powder to form cement clinker, a third stage for cooling the sintered cement clinker, and a fourth stage for crushing the sintered cement clinker to form cement. The first stage for crushing raw material to form raw powder and the fourth stage for crushing the sintered cement clinker to form cement are structurally combined. In this way, during servicing or repair of one crushing stage, the plant need not be shut down because, y variable circuitry switching, the crushing stages permit plant operation with reduced production output.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KHD HUMBOLDT WEDAG GMBHCOLOGNE GERMANY COLOGNE NORTH RHINE-WESTPHALIA

International Classification(s)

loading....
  • 2012 Application Filing Year
  • B02C Class
  • 384 Applications Filed
  • 311 Patents Issued To-Date
  • 80.99 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances20122013201420152016201720182019202020212022202320240255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Strasser, Siegfried Much, DE 20 143

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • B02C Class
  • 0 % this patent is cited more than
  • 9 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges871881621101 - 1011 - 2021 - 3041 - 5051 - 600102030405060708090100110120130140150160170180190200

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 12, 2028