Turbocharger assembly
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jul 5, 2016
Grant Date -
Oct 4, 2012
app pub date -
Mar 5, 2012
filing date -
Mar 4, 2011
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
According to an aspect of the present invention, there is provided a turbocharger assembly, comprising: a turbocharger; one or more actuators for controlling a flow of fluid in, around, or associated with the operation of the turbocharger; control electronics for use in controlling actuation of the one or more actuators; and boost electronics configured to receive an input voltage, and to provide a boosted output voltage to the control electronics.
First Claim
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
CUMMINS TURBO TECHNOLOGIES LIMITED | HUDDERSFIELD WEST YORKSHIRE HD1 6RA |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Carter, Jeffrey | Mirfield, GB | 29 | 70 |
# of filed Patents : 29 Total Citations : 70 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 1 Citation Count
- F02B Class
- 12.84 % this patent is cited more than
- 9 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jan 5, 2028 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Legal Events

Matter Detail

Renewals Detail
