Method and apparatus for autonomous downhole fluid selection with pathway dependent resistance system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9382779
APP PUB NO 20140048282A1
SERIAL NO

14062775

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Apparatus and methods for controlling the flow of fluid, such as formation fluid, through an oilfield tubular positioned in a wellbore extending through a subterranean formation. Fluid flow is autonomously controlled in response to change in a fluid flow characteristic, such as density or viscosity. In one embodiment, a fluid diverter is movable between an open and closed position in response to fluid density change and operable to restrict fluid flow through a valve assembly inlet. The diverter can be pivotable, rotatable or otherwise movable in response to the fluid density change. In one embodiment, the diverter is operable to control a fluid flow ratio through two valve inlets. The fluid flow ratio is used to operate a valve member to restrict fluid flow through the valve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALLIBURTON ENERGY SERVICES INC3000 N SAM HOUSTON PARKWAY E HOUSTON TX 77032

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
DeJesus, Orlando Frisco, US 18 645
Dykstra, Jason D Carrollton, US 152 3737
Fripp, Michael Linley Carrollton, US 369 2820
Gano, John C Carrollton, US 120 5060
Holderman, Luke Plano, US 11 286

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00