Structural element for heat-insulating purposes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9382705
APP PUB NO 20140202102A1
SERIAL NO

14238302

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Structural element for heat-insulating purposes between two structural parts, in particular between a building (A) and a projecting exterior part (B), formed of an insulating body (16), which is to be arranged between the two structural parts, and of reinforcing elements in the form of at least load-bearing elements (19a, 19b) which, with the structural element (10) in the installed state, run through the insulating body substantially horizontally and transversely to the substantially horizontal longitudinal extent of the insulating body, and can be connected at least indirectly to each of the two structural parts, wherein the load-bearing element is formed in more than one part and has at least one load-bearing web (19a, 19b) and a separate compressive-force-distributing element (20a, 20b) on at least one of its end sides (22a, 22b, 22c, 22d) directed towards the one of the two structural parts, and the compressive-force-distributing element (20a, 20b) is produced from a material which has a level of thermal conductivity λ which is lower than 2.0 W/mK.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHOCK BAUTEILE GMBH76534 BADEN-BADEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Braasch, Harald Sinzheim, DE 5 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00