recovered from another alkali production process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9382125
APP PUB NO 20150175434A1
SERIAL NO

14576844

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for the joint production of crystalline sodium bicarbonate and another alkali compound, in which the step for producing such alkali compound generates CO2 as a byproduct, at least a portion of which is used as a feed to the sodium bicarbonate production step. The produced alkali compound is preferably crystalline sodium sulfite. The joint production process preferably employs as feedstock one or more sodium carbonate liquors derived from trona ore. A gas feed which contains CO2 byproduct is subjected to a gas treatment which may include water removal and/or compression before it is used to produce sodium bicarbonate crystals from a sodium carbonate liquor. Such gas feed may comprise a reactor offgas exiting a sulfite reactor; a vent gas exiting a feed or surge tank; a decarbonation gas exiting a decarbonation unit; a vent gas vented from a crystallizer heater; or combinations of two or more thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOLVAY CHEMICALS INC3333 RICHMOND AVENUE HOUSTON TX 77098

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hansen, David M Green River, US 31 668
Kisielewski, James C Green River, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00