Electromagnetic contactor manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9378906
APP PUB NO 20140101937A1
SERIAL NO

14134756

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electromagnetic contactor manufacturing method includes a step of forming an arc extinguishing chamber connection portion by simultaneously brazing a fixed terminal and a pipe penetrating and fixed to a tub-shaped arc extinguishing chamber, and a tube portion of a first connection member in communication with an open end portion of the arc extinguishing chamber; a step of forming a cap connection portion having a flange portion extending outward in a radial direction from an open end of a bottomed tubular cap; and a step of disposing a flange portion of the first connection member and a flange portion of a second connection member in close contact with a base plate in which an aperture hole is formed, and welding each of the flange portions to the base plate so that the arc extinguishing chamber connection portion and the cap connection portion are in communication through the aperture hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJI ELECTRIC CO LTDKANAGAWA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imamura, Seiji Kawasaki, JP 9 172
Ogawa, Taku Kounosu, JP 7 17
Okamoto, Kouichi Hino, JP 28 215
Takaya, Kouetsu Kounosu, JP 103 796
Yamamoto, Yuichi Kounosu, JP 199 2537

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 28, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00