Apparatus and method for well logging and data processing device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9377555
SERIAL NO

13996149

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure relates to an apparatus and a method for well logging as well as a data processing device thereof. Said apparatus for well logging comprises a drill collar body and an array of antennas, wherein said array of antennas comprises at least a pair of transmitting antenna and receiving antenna, said transmitting antenna and receiving antenna are configured for generating a curve of axial forward depth of investigation. By employing the method for well logging according to the present invention, not only the variation of resistivity in the axial forward formation may be measured in real time during the drilling, but also the interfacial characteristics of the axial forward formations having different resistivity may be discriminated during drilling.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA PETROLEUM & CHEMICAL CORPORATIONBEIJING 100728
SHENGLI DRILLING TECHNOLOGY RESEARCH INSTITUTE OF SINOPECNO 827 BEIYI ROAD DONGYING CITY 257017

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Zuohui Dongying, CN 7 20
Lin, Nan Dongying, CN 53 183
Liu, Qinglong Dongying, CN 13 12
Wei, Baojun Dongying, CN 2 1
Xiao, Hongbing Dongying, CN 9 20
Yang, Jinzhou Dongying, CN 13 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 28, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00